Portfolio

Fleet Street fire sprinklers construction

Fleet Street Pipe Replacement

Carlsbad, CA

Roof system replacement while reconnecting floor coverage in 45,000 square foot office space during full tenant buildout.

Metropolitan water district building

Los Angeles Metropolitan Water District

Los Angeles, CA

Assessment analysis and consulting for remediation of ongoing fire sprinkler corrosion issues.

Luna Warner building

Luna Warner Center

Los Angeles, CA

Removal of deficient and replacement of new fire sprinkler heads in two story, 80 unit, residential occupied apartment complex.

Cushman office building

Cushman & Wakefield Corrosion Management

San Diego, CA

Over 15 properties including office spaces, manufacturing facilities and laboratories. Recurring corrosion management services, maintenance and repairs.

Jones Lang aerial image

Jones Lang Lasalle Inspections

San Diego, CA

Recurring inspection and repair services including multiple story occupied office buildings and parking structures.

Faraday office building

Faraday Assessment and Corrosion Management

Carlsbad, CA

A corrosion management strategy was implemented after frequent pinhole leaks caused damage and business disruption in a two story, 233,000 SF occupied office space built in 1990. Service solutions included internal sprinkler pipe video scoping, pipe samples, pipe replacement, corrosion control equipment installation, and nitrogen treatments on four separate fire sprinkler systems. Since the implementation of the corrosion management strategy, corrosion related issues significantly reduced, with no recent reports of leaks.

Panera bread logo

Panera Bread New Construction Installation

San Diego, CA

Design, engineering, fabrication and installation for brand new construction restaurant space.

Wacker office building

Wacker Emergency Service and Corrosion Management

San Diego, CA

High risk liability emergency call for pinholes leaks – the root cause of corrosion within the systems was oxygen attack of the piping due to space buildouts. The solution included partial replacement of sprinkler piping, broken valve repairs and nitrogen treatment in an occupied biopharma facility. Emergency service provided after hours to prevent business disruption.